5"Dia. Diablo Pair Expanded Chrome Exhaust Stack

5 inch Diablo Pair Expanded

Features:

  • Triplex Nickel for Adhesion & Corrosion Resistance
  • Multistep Polishing for Smooth Surface
  • Highest Quality Chrome Stack
  • Mirror-like Chrome Finish

"Made in USA"

⚠ Lead Time: 16 to 20 weeks!

Choose Length

  


Availability:See Shipping GuideShipping:See Cart
Tax:PaidWeight:9 lbs.
Model No.:705RC-LLL-1103
705LC-LLL-1103
ManufacturerLincoln Chrome
Returns30 days w/ 25% Restocking Fee




Exhaust Stack Tip & End

diablo stack

Choose lengths from 24" to 120" (2 to 10 ft.). 5" inside diameter Chrome Truck Stacks with a Diablo tip and Expanded End.

The exhuast stack uses a flawless material thats meets a standard twice that of ASTM specifications. The stack material undergoes multistep polishing for a smooth surface, a multiple-pass cleaning treatment, a three layers of nickel plating for improved adhesion and corrosion resistance and, finally, a layer of chrome.

Note: Expanded end has a 5" inside diameter.





⚠ Please Note: The pandemic brought the American steel industry to its knees last spring, forcing manufacturers to shut down production as they struggled to survive the imploding economy. But as the recovery got underway, mills were slow to resume production, and that created a massive steel shortage.

Domestic steel mills that idled furnaces last year amid fears of a prolonged pandemic-induced economic downturn have been slow in ramping up production, despite a recovery in demand for cars and trucks, appliances, and other steel products.

The delays in stack production can be significant and it is possible those delays might cause an extended lead time.


Expected Lead Time for Lincoln Chrome Stacks

5" Stacks6" Stacks7" Stacks8" Stacks
Miter8-10 weeks8-10 weeks6-8 weeks6-8 weeks
Curve8-12 weeks8-12 weeks8-12 weeks8-12 weeks
Bullhorn16-20 weeks16-20 weeks12-16 weeks12-16 weeks
Flat Top8-10 weeks8-10 weeks6-8 weeks6-8 weeks
Short 308-12 weeks8-12 weeks8-12 weeks8-12 weeks
West Coast Curve8-12 weeks8-12 weeks8-12 weeks8-12 weeks
Diablo16-20 weeks16-20 weeks12-16 weeks12-16 weeks

⚠ Please Note: It's possible the Lead Time could be doubled. We apologized but we have no control of the Lead Time.


-True Support Team


See Chrome Stack Technical page See Chrome Stack (FAQ) Frequently Asked Questions

More 5 Inch Expanded Truck Stacks